G21D102N4

GILLIG CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-06-22
Personnel SC, & TS
Temperature (°F) 75
Humidity (%) 80
Wind Direction W
Wind Speed (MPH) 6
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments No damage or deformation was observed and no problems were encountered with the towing interface.
Description and location of any structural damage None noted.
General Comments A front lift tow was performed incorporating a hydraulic under lift.