EZ TRANS

CHAMPION BUS INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2005-07-28 Temperature: 76
Personnel: T.S. , D.L., E.L., R.C., C.S., &S.C. Test Load (lbs): 19500
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.229 -0.229 -0.008 -0.008
2 0.000 0.141 0.141 0.025 0.025
3 0.000 0.171 0.171 0.041 0.041
4 0.000 0.293 0.293 0.035 0.035
5 0.000 0.218 0.218 0.030 0.030
6 0.000 0.437 0.437 0.055 0.055
7 0.000 0.444 0.444 0.045 0.045
8 0.000 0.182 0.182 0.018 0.018
9 0.000 0.246 0.246 0.021 0.021
10 0.000 0.244 0.244 0.018 0.018
11 0.000 0.149 0.149 0.013 0.013
12 0.000 -0.206 -0.206 -0.010 -0.010

Loading Sequence: 1

Date: 2005-07-28 Temperature: 76
Personnel: T.S. , D.L., E.L., R.C., C.S., &S.C. Test Load (lbs): 19500
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.008 -0.203 -0.195 -0.003 0.005
2 0.025 0.128 0.103 0.027 0.002
3 0.041 0.249 0.208 0.042 0.001
4 0.035 0.275 0.240 0.036 0.001
5 0.030 0.211 0.181 0.031 0.001
6 0.055 0.432 0.377 0.057 0.002
7 0.045 0.435 0.390 0.050 0.005
8 0.018 0.188 0.170 0.020 0.002
9 0.021 0.248 0.227 0.024 0.003
10 0.018 0.242 0.224 0.018 0.000
11 0.013 0.146 0.133 0.015 0.002
12 -0.010 -0.201 -0.191 -0.011 -0.001