MB55 CHASSIS

FREIGHTLINER CUSTOM CHASSIS CORP Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2005-08-23
Personnel
Temperature (°F) 81
Humidity (%) 74
Wind Direction NW
Wind Speed (MPH) 6
Barometer (in.Hg) 30.14

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments
Description and location of any structural damage
General Comments