DE 60 LFA

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2006-12-04
Personnel S.C. & T.S.
Temperature (°F) 30
Humidity (%) 68
Wind Direction NW
Wind Speed (MPH) 8-10
Barometer (in.Hg) 30.06

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the tow or towing interface were encountered.