D4500

MOTOR COACH INDUSTRIES Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2006-11-15
Personnel S.C. and T.S.
Temperature (°F) 45
Humidity (%) 88
Wind Direction sw
Wind Speed (MPH) 5
Barometer (in.Hg) 29.97

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments Caution was taken not to damage the sir dryer located directly above and forward of the front axle.