ORION BUS INDUSTRIES Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-11-20
Personnel S.C. & E.D.
Temperature (°F) 40
Humidity (%) 55
Wind Direction NW
Wind Speed (MPH) 8
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and test bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and wrecker.
Towing Comments A front lift tow was performed incoporation a hydraulic under lift.
Description and location of any structural damage
General Comments None.