CHALLENGER

CHAMPION BUS INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1899-12-29
Personnel S.C.
Temperature (°F) 48
Humidity (%) 58
Wind Direction N
Wind Speed (MPH) 5
Barometer (in.Hg) 30.17

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the tow or towing interface were encountered during testing.