CONCORD II

GLAVAL BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1901-12-03
Personnel S.C.
Temperature (°F) 82
Humidity (%) 48
Wind Direction N
Wind Speed (MPH) 3
Barometer (in.Hg) 30.03

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connectin was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the tow or towing interface were encoutered.