CONCORD II
GLAVAL BUS
|
Date | 1901-12-03 |
---|---|
Personnel | S.C. |
Temperature (°F) | 82 |
Humidity (%) | 48 |
Wind Direction | N |
Wind Speed (MPH) | 3 |
Barometer (in.Hg) | 30.03 |
Test Results
Inspect tow equipment-bus interface | A safe and adequate connection was made between the tow equipment and the bus. |
---|---|
Inspect tow equipment-wrecker interface | A safe and adequate connectin was made between the tow equipment and the wrecker. |
Towing Comments | A front lift tow was performed incorporating a hydraulic under lift wrecker. |
Description and location of any structural damage | |
General Comments | No problems with the tow or towing interface were encoutered. |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List