APOLLO

GLAVAL BUS

Dynamic Towing Test Data Form

Date 2001-10-05
Personnel S.C. & T.S.
Temperature (°F) 64
Humidity (%) 56
Wind Direction SW
Wind Speed (MPH) 9
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front litft tow was performed incorporation a heavy duty wrecker equipped wigh a hydraulic under lift.
Description and location of any structural damage
General Comments No problems were encountered with the tow or towing interface.