42.5-BRT.01

NORTH AMERICAN BUS INDUSTRIES Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2007-09-11
Personnel S.C.
Temperature (°F) 70
Humidity (%) 100
Wind Direction SE
Wind Speed (MPH)
Barometer (in.Hg) 29.95

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the bus.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the towing interface or the tow were encoutered.