GMC CROSS COUNTRY

FEDERAL COACH Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2008-01-09
Personnel S.C. & T.S.
Temperature (°F) 48
Humidity (%) 65
Wind Direction SW
Wind Speed (MPH) 10
Barometer (in.Hg) 30.09

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the tow or towing interface were encountered.