SPORT

GLAVAL BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2008-07-21
Personnel T.S. & P.S.
Temperature (°F) 84
Humidity (%) 49
Wind Direction WSW
Wind Speed (MPH) 12
Barometer (in.Hg) 29.9

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the tow or towing interface were encountered.