D4500

MOTOR COACH INDUSTRIES Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2001-08-02 Temperature: 80
Personnel: E.L., S.C., T.S., D.C., & M.H. Test Load (lbs): 33375
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.007 -0.007 -0.001 -0.001
2 0.000 0.108 0.108 0.021 0.021
3 0.000 0.185 0.185 0.025 0.025
4 0.000 0.177 0.177 0.032 0.032
5 0.000 0.099 0.099 0.018 0.018
6 0.000 0.012 0.012 -0.002 -0.002
7 0.000 0.011 0.011 -0.002 -0.002
8 0.000 0.103 0.103 0.210 0.210
9 0.000 0.186 0.186 0.033 0.033
10 0.000 0.208 0.208 0.032 0.032
11 0.000 0.128 0.128 0.025 0.025
12 0.000 -0.013 -0.013 -0.003 -0.003

Loading Sequence: 1

Date: 2001-08-02 Temperature: 80
Personnel: E.L., S.C., T.S., D.C., & M.H. Test Load (lbs): 33375
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.001 -0.012 -0.011 -0.003 -0.002
2 0.021 0.108 0.087 0.023 0.002
3 0.025 0.189 0.164 0.031 0.006
4 0.032 0.181 0.149 0.032 0.000
5 0.018 0.100 0.082 0.020 0.002
6 -0.002 0.009 0.011 -0.007 -0.005
7 -0.002 0.008 0.010 -0.006 -0.004
8 0.021 0.104 0.083 0.022 0.001
9 0.033 0.189 0.156 0.036 0.003
10 0.032 0.211 0.179 0.035 0.003
11 0.025 0.132 0.107 0.027 0.002
12 -0.003 -0.011 -0.008 -0.003 0.000