D4500

MOTOR COACH INDUSTRIES Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-11-20
Personnel S.C & E.D.
Temperature (°F) 40
Humidity (%) 55
Wind Direction NW
Wind Speed (MPH) 10
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the bus and tow equipment.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow connection was made between the tow equipment and wrecker.
Towing Comments A front lift tow was performed using a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments The manufacturer does not recommend towing from the rear, therefore a rear tow was not performed.