SPRINTER

DAIMLER BUSES NORTH CAROLINA LLC Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2008-07-10
Personnel SC
Temperature (°F) 79
Humidity (%) 45
Wind Direction nw
Wind Speed (MPH) 10
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the wrecker.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic underlift wrecker.
Description and location of any structural damage No problems with the towing interface or tow were encountered.
General Comments