40C LFW CNG

NORTH AMERICAN BUS INDUSTRIES Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-09-12
Personnel S.C. and E.D.
Temperature (°F) 72
Humidity (%) 45
Wind Direction NW
Wind Speed (MPH) 3 - 5
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed with a hydraulic underlift.
Description and location of any structural damage Note noted.
General Comments None