40C LFW CNG

NORTH AMERICAN BUS INDUSTRIES Pdf Download PDF Report

Static Towing Test Data Form

Date: 2000-11-01
Personnel: S.C. and E.D.
Temperature: 47

 

Inspect right front tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation
Inspect left front tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
Inspect right rear tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation
Inspect left rear tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
General comments of any other structure deformation or failure:
All four poulls were completed to full test load of 29,940 lbs. No damage or deformation was noted during testing. The test bus not equipped for rear towing.