AH-28

CHANCE COACH, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-08-08
Personnel S.C. & E.D.
Temperature (°F) 75
Humidity (%) 72
Wind Direction SW
Wind Speed (MPH) 5
Barometer (in.Hg) 30.15

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the test bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed using a hydraulic lift. No problems with the towing interface were encountered.
Description and location of any structural damage Note noted.
General Comments