BSTR36F
SUPREME CORPORATION
|
Date | 2000-10-17 |
---|---|
Personnel | S.C. & P.M. |
Temperature (°F) | 52 |
Humidity (%) | 100 |
Wind Direction | S.E. |
Wind Speed (MPH) | 5 |
Barometer (in.Hg) | 29.9 |
Test Results
Inspect tow equipment-bus interface | A safe and adequate connection was made between the tow equipment and the bus. |
---|---|
Inspect tow equipment-wrecker interface | A safe and adequate connection was made between the tow equipment and the wrecker. |
Towing Comments | A hydraulic under lift was incorporated to perform a front lift tow. |
Description and location of any structural damage | Note noted. |
General Comments |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List