BSTR36F

SUPREME CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-10-17
Personnel S.C. & P.M.
Temperature (°F) 52
Humidity (%) 100
Wind Direction S.E.
Wind Speed (MPH) 5
Barometer (in.Hg) 29.9

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A hydraulic under lift was incorporated to perform a front lift tow.
Description and location of any structural damage Note noted.
General Comments