SLF 230

THOMAS BUILT Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-01-03
Personnel J.P., G.F. & P.M.
Temperature (°F) 21
Humidity (%) 56
Wind Direction W
Wind Speed (MPH) 5
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and test bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front flat tow was performed with no problems noted with the towing interface and no damage or deformation to the test bus.
Description and location of any structural damage Note noted.
General Comments Tow accomplished using manufacturer supplied tow eyes and tow bar.