1135

GOSHEN COACH Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-10-31
Personnel S.C. & P.M.
Temperature (°F) 54
Humidity (%) 46
Wind Direction NW
Wind Speed (MPH) 5
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment (chains) and the wrecker.
Towing Comments A front flat tow was performed. No problems were encountered with the towing interface.
Description and location of any structural damage Note noted.
General Comments None