AN 440L

NEOPLAN USA CORPORATION Pdf Download PDF Report

Scheduled Maintenance

Date Test Miles Service Activity Downtime Hours
11-21-00 866 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
12-01-00 2167 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
12-05-00 3350 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
12-11-00 4096 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
12-18-00 5420 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
01-03-01 6566 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
01-15-01 8196 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
02-02-01 11202 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
02-15-01 14224 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0
02-22-01 15000 P.M. / Inspection Linkage, tie rods, universals/u-joints all lubed; all fluids checked. 4.0 4.0