SLC 32' CNG

DAIMLER CHRYSLER COMMERCIAL BUSES NA Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-11-20
Personnel S.C.
Temperature (°F) 40
Humidity (%) 55
Wind Direction NW
Wind Speed (MPH) 8-12
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the bus and tow equipment.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the toe equipment and wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift.
Description and location of any structural damage
General Comments Manufacturer does not recommend towing from the rear.