Opus / LFB-29

CHANCE COACH, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-04-11
Personnel S.C., E.D. & B.S.
Temperature (°F) 58
Humidity (%) 95
Wind Direction NW
Wind Speed (MPH) 5-8
Barometer (in.Hg) 29.89

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front flat tow was performed incorporating a hydraulic slider by attaching to the tow eyes by means of a clevis.
Description and location of any structural damage Note noted.
General Comments Manufacturer was unable to supply rear tow eyes at this time, therefore, the rear test was not performed.