Opus / LFB-29

CHANCE COACH, INC. Pdf Download PDF Report

Static Towing Test Data Form

Date: 2001-04-20
Personnel: S.C., T.S. & S.R.
Temperature: 45

 

Inspect right front tow eye and adjoining structure.
Comments: All welds verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left front tow eye and adjoining structure.
Comments: All welds verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect right rear tow eye and adjoining structure.
Comments: All welds verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left rear tow eye and adjoining structure.
Comments: No damage or deformation.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: All welds verified.
General comments of any other structure deformation or failure:
All four front and rear pulls were performed to the total target test load (25,800 lbs) with no damage or deformation observed.