CSFE

BLUE BIRD CORPORATION Pdf Download PDF Report

Static Towing Test Data Form

Date: 2001-03-15
Personnel: S.C., E.D., E.L., T.S. & S.I.
Temperature: 39

 

Inspect right front tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left front tow eye and adjoining structure.
Comments: No damage or deformation.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
Inspect right rear tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left rear tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
General comments of any other structure deformation or failure:
Test completed to full target test load of 25,020 lbs. No damage or deformation was observed during testing. The test bus not equipped for rear towing.