M 2000

Dupont Trolley Industries Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-03-13
Personnel E.D. & T.S.
Temperature (°F) 40
Humidity (%) 95
Wind Direction NE
Wind Speed (MPH) 5
Barometer (in.Hg) 28.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front and rear lift tow was performed incorported a hydraulic lift wrecker. No damage or deformation was observed and no problems were encountered with the towing interface.
Description and location of any structural damage Note noted.
General Comments