Golden Gate Trolley

Cable Car Classics, Inc. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-12-21
Personnel S.C.
Temperature (°F) 21
Humidity (%) 48
Wind Direction NW
Wind Speed (MPH) 5
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A hydraulic under lift was incorporated as the towing interface. A rear lift tow was performed. No problems were encountered with the towing interface.
Description and location of any structural damage Note noted.
General Comments