844 CNG

GOSHEN COACH Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2002-01-24
Personnel S.C.
Temperature (°F) 51
Humidity (%) 90
Wind Direction
Wind Speed (MPH) Calm
Barometer (in.Hg) 29.95

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the bus and tow equipment.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift. No problems were encountered with the tow or towing interface.
Description and location of any structural damage
General Comments No comments.