D-35
NEW FLYER
|
Date | 1991-02-12 |
---|---|
Personnel | S.M. |
Temperature (°F) | 30 |
Humidity (%) | |
Wind Direction | |
Wind Speed (MPH) | |
Barometer (in.Hg) |
Test Results
Inspect tow equipment-bus interface | No problems noted. |
---|---|
Inspect tow equipment-wrecker interface | No problems noted. |
Towing Comments | Video tape and photos were taken. There was no problem noted in towing throughtout the towing process. |
Description and location of any structural damage | |
General Comments | The tow chains were fastened to the radius arm front head. The bus did well with the towing process and hookup was very easy. |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List