D-35

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1991-02-12
Personnel S.M.
Temperature (°F) 30
Humidity (%)
Wind Direction
Wind Speed (MPH)
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface No problems noted.
Inspect tow equipment-wrecker interface No problems noted.
Towing Comments Video tape and photos were taken. There was no problem noted in towing throughtout the towing process.
Description and location of any structural damage
General Comments The tow chains were fastened to the radius arm front head. The bus did well with the towing process and hookup was very easy.