T80208

TRANSPORTATION MANUFACTURING CORPORATION (TMC)

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1990-11-09 Temperature: 65
Personnel: S.M. Test Load (lbs): 27279
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.082 0.082 0.025 0.025
2 0.000 0.062 0.062 0.024 0.024
3 0.000 0.313 0.313 0.043 0.043
4 0.000 0.324 0.324 0.039 0.039
5 0.000 0.337 0.337 0.044 0.044
6 0.000 0.326 0.326 0.045 0.045
7 0.000 0.263 0.263 0.033 0.033
8 0.000 0.146 0.146 0.027 0.027
9 0.000 0.110 0.110 0.025 0.025
10 0.000 0.044 0.044 0.017 0.017
11 0.000 0.025 0.025 0.018 0.018
12 0.000 0.014 0.014 0.016 0.016

Loading Sequence: 1

Date: 1990-11-09 Temperature: 65
Personnel: S.M. Test Load (lbs): 27279
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.028 0.082 0.054 0.028 0.000
2 0.025 0.060 0.035 0.025 0.000
3 0.041 0.319 0.278 0.048 0.007
4 0.034 0.337 0.303 0.044 0.010
5 0.040 0.355 0.315 0.049 0.009
6 0.043 0.348 0.305 48.000 47.957
7 0.033 0.282 0.249 0.040 0.007
8 0.026 0.152 0.126 0.031 0.005
9 0.025 0.118 0.093 0.026 0.001
10 0.016 0.024 0.008 0.019 0.003
11 0.018 0.024 0.006 0.019 0.001
12 0.016 0.014 -0.002 0.022 0.006

Loading Sequence: 1

Date: 1990-11-09 Temperature: 65
Personnel: S.M. Test Load (lbs): 27279
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.028 0.086 0.058 0.035 0.007
2 0.025 0.062 0.037 0.027 0.002
3 0.048 0.321 0.273 0.045 -0.003
4 0.044 0.341 0.297 0.044 0.000
5 0.049 0.355 0.306 0.046 -0.003
6 0.048 0.345 0.297 0.045 -0.003
7 0.040 0.282 0.242 0.037 -0.003
8 0.031 0.155 0.124 0.032 0.001
9 0.026 0.118 0.092 0.026 0.000
10 0.019 0.045 0.026 0.022 0.003
11 0.019 0.023 0.004 0.021 0.002
12 0.022 0.019 -0.003 0.027 0.005