436

IKARUS USA, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1991-06-17
Personnel S.M.
Temperature (°F) 85
Humidity (%)
Wind Direction
Wind Speed (MPH)
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface The top mounting bolts on the tow bar did not match up with the mounting holes in the frame. The tow bar holes were elongated to make it work.
Inspect tow equipment-wrecker interface No problem with towing equipment and wrecker interface.
Towing Comments The coach cracked in a straight line behind the wrecker.
Description and location of any structural damage
General Comments When the holes of the tow bar were elongated, the tow bar assembly was satisfactory and the base of the bar bedded against the frame snugly. The towing process went very well.