ORION II
BUS INDUSTRIES OF AMERICA, INC.
|
Date | : | 1992-03-31 | |||
Personnel | : | BL, RH and BR | |||
Temperature (°F) | : | 42 | Humidity (%) | : | 46 |
Wind Speed (mph) | : | 7 | Wind Direction | : | nw |
Barometric Pressure (in.Hg) | : | 29.92 | |||
Verify that microphone height is 4 feet, wind speed is less than 12 mpg and ambient temperature is between 30 F and 90 F: true checked by BL | |||||
Initial Sound Level Meter Calibration: true checked by BL | |||||
Exterior Ambient Noise Level dB(A): 39.4 |
Accessories and Air Conditioning ON | |||
---|---|---|---|
Throttle Position | Engine RPM | Curb (Right) Side dB(A) | Street (Left) Side dB(A) |
Measured | Measured | ||
Low Idle | 654 | 56.9 | 59.1 |
High Idle | 804 | 59.5 | 63.2 |
Wide Open Throttle | 3258 | 74.6 | 80.8 |
Accessories and Air Conditioning OFF | |||
---|---|---|---|
Throttle Position | Engine RPM | Curb (Right) Side dB(A) | Street (Left) Side dB(A) |
Measured | Measured | ||
Low Idle | 702 | 55.0 | 59.4 |
High Idle | 842 | 57.3 | 63.7 |
Wide Open Throttle | 3264 | 74.1 | 79.7 |
Final Sound Level Meter Calibration Check: true checked by BL |
Comments: Wind screen installed. |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List