ORION II

BUS INDUSTRIES OF AMERICA, INC. Pdf Download PDF Report

Static Towing Test Data Form

Date: 1992-04-07
Personnel: BL, DF, BR and CG
Temperature: 62

 

Inspect right front tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: Inspected and found to be normal after each pull.
Inspect left front tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
Inspect right rear tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: Inspected and found to be normal after each pull.
Inspect left rear tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments:
General comments of any other structure deformation or failure:
All pulls were made at 1.2 x 15,750 (CW) or 18,900, and were made successfully and without damage to tow eyes.