CENTURION

CHAMPION MOTOR COACH, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1992-08-06
Personnel B.L., & R.H.
Temperature (°F) 80
Humidity (%) 60
Wind Direction NE
Wind Speed (MPH) 3
Barometer (in.Hg) 28.36

Test Results

Inspect tow equipment-bus interface OK
Inspect tow equipment-wrecker interface OK
Towing Comments 4 x 4 wood beam was placed under bumper for protection.
Description and location of any structural damage
General Comments