MBC-II FUTURA

GIRARDIN Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1993-01-04
Personnel B.L. & R.H.
Temperature (°F) 58
Humidity (%) 75
Wind Direction SW
Wind Speed (MPH) 7
Barometer (in.Hg) 30.25

Test Results

Inspect tow equipment-bus interface None
Inspect tow equipment-wrecker interface None
Towing Comments A 4''x4'' beam and 4''x4'' blocks were used to protect the bumper and clear the steering arm.
Description and location of any structural damage None noted
General Comments It was not necessary to disconnect drive shaft.