AH-28 TROLLEY

CHANCE COACH, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1993-04-01
Personnel B.L., S.C. and R.H.
Temperature (°F) 51
Humidity (%) 95
Wind Direction se
Wind Speed (MPH) 6
Barometer (in.Hg) 95.0

Test Results

Inspect tow equipment-bus interface Appeared normal
Inspect tow equipment-wrecker interface Appeared normal
Towing Comments A metal rod was to be placed through the two front tow eyes according to the manufacturer's recommendations.
Description and location of any structural damage No damage noted.
General Comments None noted.