ESCORT RE

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1993-04-16
Personnel B.L., S.C. & R.H.
Temperature (°F) 50
Humidity (%) 90
Wind Direction SW
Wind Speed (MPH) 4
Barometer (in.Hg) 29.95

Test Results

Inspect tow equipment-bus interface Interface appeared normeal
Inspect tow equipment-wrecker interface Interface appeared normeal
Towing Comments A normal hook up was made with chain from tow truck to tow hooks on bus.
Description and location of any structural damage None noted
General Comments Rear axle shafts were removed.