ELF I (2GCTA52MOP8000027)
GENERAL COACH
|
Date: | 1993-05-26 |
Personnel: | B.L., S.C., & B.R. |
Temperature: | 72 |
Inspect right front tow eye and adjoining structure. |
---|
Comments: All torques verified. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: No damage noted. |
Inspect left front tow eye and adjoining structure. |
Comments: |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: |
Inspect right rear tow eye and adjoining structure. |
Comments: All torques verified. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: No damage noted. |
Inspect left rear tow eye and adjoining structure. |
Comments: |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: |
General comments of any other structure deformation or failure: |
A weight of 11400 lbs was used for test. Bus was no equipped with rear towing attachments. No rear test performed. |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List