T80208 (CNG)

TRANSPORTATION MANUFACTURING CORPORATION (TMC) Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1993-02-15 Temperature: 70
Personnel: B.L. and B.R. Test Load (lbs): 26250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.188 0.188 0.052 0.052
2 0.000 0.184 0.184 0.044 0.044
3 0.000 0.404 0.404 0.074 0.074
4 0.000 0.401 0.401 0.069 0.069
5 0.000 0.295 0.295 0.049 0.049
6 0.000 0.033 0.033 0.026 0.026
7 0.000 0.025 0.025 0.013 0.013
8 0.000 0.302 0.302 0.036 0.036
9 0.000 0.318 0.318 0.007 0.007
10 0.000 0.273 0.273 0.026 0.026
11 0.000 0.049 0.049 0.011 0.011
12 0.000 0.097 0.097 0.016 0.016

Loading Sequence: 1

Date: 1993-02-15 Temperature: 70
Personnel: B.L. and B.R. Test Load (lbs): 26250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.052 0.186 0.134 0.051 -0.001
2 0.044 0.185 0.141 0.045 0.001
3 0.074 0.404 0.330 0.077 0.003
4 0.069 0.400 0.331 0.072 0.003
5 0.049 0.296 0.247 0.050 0.001
6 0.026 0.033 0.007 0.027 0.001
7 0.013 0.028 0.015 0.015 0.002
8 0.036 0.305 0.269 0.039 0.003
9 0.007 0.319 0.312 0.010 0.003
10 0.026 0.273 0.247 0.029 0.003
11 0.011 0.050 0.039 0.012 0.001
12 0.016 0.097 0.081 0.017 0.001