AN440

NEOPLAN USA CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1993-07-13
Personnel B.L., S.C. and R.H.
Temperature (°F) 82
Humidity (%) 70
Wind Direction w
Wind Speed (MPH) 4
Barometer (in.Hg) 30.01

Test Results

Inspect tow equipment-bus interface Tow bar connected to tow apparatus, connection satisfactory.
Inspect tow equipment-wrecker interface Connection satisfactory.
Towing Comments Manufacturer's supplied tow apparatus was not of the same design as illustrated in the manufacturer's manual.
Description and location of any structural damage
General Comments The tow eyes had to be turned out (the Y screw into position and then removed after tow) approximately one inch to clear body to hook up tow bar with connecting pins.