ER3116TAZ15

THOMAS BUILT Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1993-08-24
Personnel B.L., S.C. & R.H.
Temperature (°F) 76
Humidity (%) 67
Wind Direction SSW
Wind Speed (MPH) 7
Barometer (in.Hg) 30.13

Test Results

Inspect tow equipment-bus interface No problems noted. A 4" x 4" wooden beam was placed under the bumper, and a 2" x 6" beam was placed between the tow equipment and the bumper for protection.
Inspect tow equipment-wrecker interface No problems noted.
Towing Comments The manufacturer's supplied tow bar was not availible for testing, therefore, a front lift tow was performed following manufacturer's procedures for a front lift tow.
Description and location of any structural damage
General Comments No problems were encountered during testing.