MPV

INDEPENDENT MOBILITY SYSTEMS, INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1993-12-16 Temperature: 70
Personnel: B.L., & S.C. Test Load (lbs): 3075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.020 -0.020 0.006 0.006
2 0.000 0.001 0.001 0.002 0.002
3 0.000 0.025 0.025 0.004 0.004
4 0.000 0.025 0.025 0.007 0.007
5 0.000 0.062 0.062 0.023 0.023
6 0.000 0.134 0.134 0.040 0.040
7 0.000 0.128 0.128 0.031 0.031
8 0.000 0.109 0.109 0.019 0.019
9 0.000 0.042 0.042 0.008 0.008
10 0.000 0.016 0.016 0.001 0.001
11 0.000 0.091 0.091 0.010 0.010
12 0.000 0.118 0.118 0.019 0.019

Loading Sequence: 1

Date: 1993-12-16 Temperature: 70
Personnel: B.L., & S.C. Test Load (lbs): 3075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.006 -0.020 -0.026 0.006 0.000
2 0.002 0.000 -0.002 0.001 -0.001
3 0.004 0.026 0.022 0.004 0.000
4 0.007 0.026 0.019 0.008 0.001
5 0.023 0.064 0.041 0.023 0.000
6 0.040 0.139 0.099 0.042 0.002
7 0.031 0.129 0.098 0.030 -0.001
8 0.019 0.108 0.089 0.019 0.000
9 0.008 0.042 0.034 0.008 0.000
10 0.001 0.016 0.015 0.000 -0.001
11 0.010 0.092 0.082 0.010 0.000
12 0.019 0.118 0.099 0.018 -0.001