D40 LF

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1994-07-12
Personnel B.L., B.R., & B.S.
Temperature (°F) 74
Humidity (%) 65
Wind Direction SW
Wind Speed (MPH) 7
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made using tow chains from the tow equipment to bus interface.
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments Two tow chains were used from the tow truck to tow eyes connected by a clevis. Safety chains were connected to the front axle. A flat tow was performed as per manufacturers instructions.
Description and location of any structural damage
General Comments None