CLASSIC

METROTRANS CORPORATION Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1994-02-28 Temperature: 68
Personnel: B.L., & B.R Test Load (lbs): 13125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.012 -0.012 0.014 0.014
2 0.000 0.119 0.119 0.000 0.000
3 0.000 0.146 0.146 -0.003 -0.003
4 0.000 0.097 0.097 -0.004 -0.004
5 0.000 0.733 0.733 0.012 0.012
6 0.000 1.309 1.309 0.000 0.000
7 0.000 0.890 0.890 0.028 0.028
8 0.000 935.000 935.000 0.276 0.276
9 0.000 0.007 0.007 0.022 0.022
10 0.000 0.013 0.013 0.052 0.052
11 0.000 -0.008 -0.008 0.091 0.091
12 0.000 -0.010 -0.010 0.073 0.073

Loading Sequence: 1

Date: 1994-02-28 Temperature: 68
Personnel: B.L., & B.R Test Load (lbs): 13125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.014 -0.001 -0.015 0.015 0.001
2 0.000 0.120 0.120 -0.001 -0.001
3 -0.003 0.144 0.147 -0.003 0.000
4 -0.004 0.094 0.098 -0.003 0.001
5 0.012 0.758 0.746 0.047 0.035
6 0.000 1.330 1.330 0.079 0.079
7 0.028 0.923 0.895 0.087 0.059
8 0.276 0.964 0.688 0.264 -0.012
9 0.022 0.035 0.013 0.019 -0.003
10 0.052 0.075 0.023 -0.057 -0.109
11 0.091 0.002 -0.089 -0.018 -0.109
12 0.073 -0.043 -0.116 -0.038 -0.111

Loading Sequence: 1

Date: 1994-02-28 Temperature: 68
Personnel: B.L., & B.R Test Load (lbs): 13125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.019 -0.019 0.004 0.004
2 0.000 0.123 0.123 0.000 0.000
3 0.000 0.147 0.147 -0.002 -0.002
4 0.000 0.099 0.099 -0.001 -0.001
5 0.000 0.701 0.701 0.005 0.005
6 0.000 1.268 1.268 0.004 0.004
7 0.000 0.863 0.863 0.012 0.012
8 0.000 0.460 0.460 0.004 0.004
9 0.000 0.014 0.014 0.005 0.005
10 0.000 0.028 0.028 0.012 0.012
11 0.000 0.010 0.010 0.022 0.022
12 0.000 -0.029 -0.029 0.033 0.033