240-AEROTECH

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1994-05-31
Personnel B.L., B.S., & N.E.
Temperature (°F) 76
Humidity (%) 55
Wind Direction NW
Wind Speed (MPH) 7
Barometer (in.Hg) 30.11

Test Results

Inspect tow equipment-bus interface A safe and adequate conection was made.
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments Two tow chains were attached to the front axle and to the tow equipment. Safety chains were also installed. A 4" x 4" wooden beam and two small 4" x 4" blocks were placed under the front bumper to clear the radiator.
Description and location of any structural damage No damage obeserved
General Comments