ORION II

BUS INDUSTRIES OF AMERICA, INC. Pdf Download PDF Report

Static Towing Test Data Form

Date: 1994-08-08
Personnel: J.P., & B.R.
Temperature: 85

 

Inspect right front tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left front tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect right rear tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left rear tow eye and adjoining structure.
Comments: No damage or deformation.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: All torques verified.
General comments of any other structure deformation or failure:
No damage or deformation was noted during testing. The 20 degree up, front & rear pulls were not performed. 20 degress could not be obtained due to the location of the tow eyes.