BLUE BIRD CORPORATION
|
Date: | 1994-09-29 |
Personnel: | B.L., S.C & R.H. |
Temperature: | 58 |
Inspect right front tow eye and adjoining structure. |
---|
Comments: Torques verified. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: Frame rail extension bent upward |
Inspect left front tow eye and adjoining structure. |
Comments: Torques verified. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: Tow eye bent upward at Apprx. 11,000 lb during the 20 degree up pull. Further testing was terminated. |
Inspect right rear tow eye and adjoining structure. |
Comments: Bolts sheared. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: During the 20 degree up pull, @ 11,000 lb, the tow eyes & frame rail extensions bent upward into panel and the tow hook attaching bolts sheared off. Further testing was terminated. |
Inspect left rear tow eye and adjoining structure. |
Comments: Tow eye bent upward at Apprx. 11,000 lb during the 20 degree up pull. Further testing was terminated. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: Torques verified. |
General comments of any other structure deformation or failure: |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List