PIONEER

ALLEN/ASHLEY Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1994-07-27
Personnel S.C.
Temperature (°F) 77
Humidity (%) 85
Wind Direction E
Wind Speed (MPH) 3
Barometer (in.Hg) 29.7

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made.
Inspect tow equipment-wrecker interface A safe and adequate connection was mane.
Towing Comments A front lift tow was performed by chaining to the front axle and use of an 8" x 8" wooden beam to protect the bumper.
Description and location of any structural damage
General Comments The vinyl cowling along the bottom of the bumper was removed in order to eliminate unnecessary damage from the tow chains.