TC 18 FD

DIAMOND COACH CORPORATION Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1994-06-22 Temperature: 78
Personnel: B.L., B.R., D.O., & N.E. Test Load (lbs): 18750
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.008 -0.008 -0.001 -0.001
2 0.000 0.204 0.204 0.055 0.055
3 0.000 0.379 0.379 0.091 0.091
4 0.000 0.366 0.366 0.105 0.105
5 0.000 0.211 0.211 0.115 0.115
6 0.000 0.708 0.708 0.295 0.295
7 0.000 0.420 0.420 0.168 0.168
8 0.000 0.066 0.066 0.012 0.012
9 0.000 0.142 0.142 0.007 0.007
10 0.000 0.173 0.173 0.014 0.014
11 0.000 0.088 0.088 0.006 0.006
12 0.000 -0.033 -0.033 -0.024 -0.024

Loading Sequence: 1

Date: 1994-06-22 Temperature: 78
Personnel: B.L., B.R., D.O., & N.E. Test Load (lbs): 18750
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.001 -0.007 -0.006 -0.002 -0.001
2 0.055 0.021 -0.034 0.060 0.005
3 0.091 0.387 0.296 0.095 0.004
4 0.105 0.374 0.269 0.109 0.004
5 0.115 0.222 0.107 0.120 0.005
6 0.295 0.756 0.461 0.296 0.001
7 0.012 0.056 0.044 0.012 0.000
8 0.007 0.125 0.118 0.008 0.001
9 0.014 0.156 0.142 0.014 0.000
10 0.006 0.073 0.067 0.005 -0.001
11 0.006 0.073 0.067 0.005 -0.001
12 -0.024 -0.033 -0.009 -0.029 -0.005